GMT / LFT Composite Mould

Home » GMT / LFT Composite Mould

THERMOPLASTIC COMPRESSION TOOLING

GMT / LFT Composite Mould

GMT and compression-moulded LFT follow a thermoplastic forming route: the heated material flows under pressure and cools to retain its shape. Material format, charge handling and temperature control drive the tooling concept.

01

Define the Thermoplastic Process First

GMT means glass-mat-reinforced thermoplastic. It is commonly supplied as sheet or panel material for forming into composite parts. LFT refers to long-fibre-reinforced thermoplastics and includes different material and processing routes.

In compression processes, a heated thermoplastic charge is formed and cooled sufficiently to retain its shape. SMC and BMC instead cure through a thermosetting reaction. The thermal system and process plan for a GMT or LFT mould therefore need to match the selected thermoplastic route.

For direct LFT compression moulding, the hot charge can be prepared on an in-line compounding system before pressing. If your material is a pelletised LFT grade intended for injection moulding, identify that at the enquiry stage; it requires a different tooling review.

02

Potential Applications

  • Automotive underbody shields and covers
  • Instrument-panel carriers and spare-wheel recesses
  • Project-specific structural and semi-structural components
  • Industrial panels, load carriers and other parts suited to the specified thermoplastic system

Material grade, reinforcement architecture and loading conditions determine whether a particular application is suitable. Send the performance targets with the part model.

03

Design Priorities for GMT and LFT Tooling

  • Charge and loading: identify the blank or charge format, loading position and transfer method.
  • Part geometry: review ribs, bosses, thickness transitions and flow distances against the material’s forming behaviour.
  • Thermal control: define the operating temperatures and available cooling or temperature-control services.
  • Dimensional stability: assess shrinkage, fibre orientation and cooling-related distortion using the selected material data.
  • Tool interfaces: agree mounting, ejection, handling clearance and any insert or local-reinforcement locations.

These items form the basis of a project review. A universal processing temperature, shrinkage value or cycle time is not appropriate for every GMT or LFT grade.

04

Match the Mould to the Production Cell

The tool must fit the complete forming cell, not only the nominal press tonnage. Platen size, daylight, loading access and ejection travel constrain the practical mould arrangement. Temperature-control connections and the handling envelope need to be resolved alongside the part geometry.

Charge preparation, transfer, trimming and downstream fixtures are distinct interfaces. Their responsibilities should be defined before detailed tooling design so a suitable mould is not paired with an incompatible loading or finishing process.

05

Trial and Acceptance Requirements

Agree the trial material and loading sequence, critical dimensions, permitted flash and trimming allowances, and the condition in which samples will be measured. If the project has structural requirements, identify the load cases, test method and acceptance criteria separately from cosmetic inspection.

Record the approved process settings and remaining actions during the trial review. Final acceptance should be based on the agreed evidence rather than an assumed cycle time or an unverified performance target.

Discuss your GMT / LFT tooling project

Send the part model, polymer grade and charge format, together with the intended forming route. Include the press and handling envelope so the tooling concept fits the production cell.

Discuss this project